One Lane Traffic on K Rd and L 15 Ln in September/October

Attention Ford River Residents

Our Township has recently received a grant of $ 189,000.00 from the Michigan Department of EGLE  for sample testing  our Township Water system for possible lead service connections to help us comply with EGLE requirements. The work will consist of digging and exposing water line connections  at various sites throughout the water system.

Work is scheduled to start September 23, 2024 and be completed around October 11,2024.

During this period there may be one lane traffic  on K Rd and L.15 Ln and shoulder closures on  Hwy M35 with reduced speeds.  Please drive carefully through these areas while work is being done for the safety of everyone.  Thank you